-
Notifications
You must be signed in to change notification settings - Fork 2.4k
Pull requests: openshift/release
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
Automate publicize configuration sync Mon, 31 Aug 2026 23:27:56 UTC
lgtm
Indicates that a PR is ready to be merged.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#84330
opened Aug 31, 2026 by
openshift-ci
Bot
Loading…
Added redhat-cne/hw-event-proxy-operator to ignore list
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#84329
opened Aug 31, 2026 by
hector-vido
Contributor
Loading…
Add must-fix and human-review-needed labels for openshift-online/argya
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#84328
opened Aug 31, 2026 by
YiqinZhang
Contributor
•
Draft
2 tasks
[DO NOT MERGE] sandboxed-containers-operator: add kata-upstream test suite and enable it on azure-ipi-kata
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#84327
opened Aug 31, 2026 by
wainersm
Contributor
Loading…
OCPMCP-358: feat: add ocp mcp tls scan periodic
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#84325
opened Aug 31, 2026 by
Cali0707
Contributor
Loading…
NVIDIA-1170: Add signed job(s)
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#84324
opened Aug 31, 2026 by
josecastillolema
Member
Loading…
ROSAENG-61841: Add MCVW Prow e2e migration (rosa-mcvw-install step + ci-operator config)
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#84323
opened Aug 31, 2026 by
dustman9000
Member
Loading…
aws-c2s/sc2s: log status code and payload on credential request failure
#84322
opened Aug 31, 2026 by
tthvo
Member
Loading…
OCPMCP-355: Add e2e-aws presubmit for openshift-mcp-server
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#84319
opened Aug 31, 2026 by
dlom
Contributor
Loading…
2 tasks
Add Azure v7 instance type spot check jobs for OCP 5.0
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#84318
opened Aug 31, 2026 by
sdodson
Member
Loading…
3 tasks
Add Azure v7 instance type spot check jobs for OCP 5.0
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#84317
opened Aug 31, 2026 by
sdodson
Member
Loading…
3 tasks
[WIP] Add EUS-to-EUS 4.20→4.22 interop test variant for ACM+CNV P2P
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
ci-operator/config: bump timeout for opct 4.22 vSphere upgrade jobs
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#84315
opened Aug 31, 2026 by
bshaw7
Contributor
Loading…
2 tasks
no-jira: adding privatelink rosa e2e testing
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#84314
opened Aug 31, 2026 by
hector-vido
Contributor
Loading…
rosa/wait-ready-operators: convert Degraded check to warning
#84311
opened Aug 31, 2026 by
redhat-chai-bot
Contributor
Loading…
chore(GCP-1122): add pvasant to GCP HCP step-registry and CI OWNERS
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#84310
opened Aug 31, 2026 by
gbarabasz
Loading…
3 tasks
Add windows-bootstorm workload to CPT bare-metal pipeline
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#84309
opened Aug 31, 2026 by
arpsharm
Contributor
Loading…
rosa/cluster/wait-ready: capture DNS diagnostics on DNS-related install failures
#84308
opened Aug 31, 2026 by
redhat-chai-bot
Contributor
Loading…
feat(eventrouter): remove base image replacement for EventRouter
#84306
opened Aug 31, 2026 by
vparfonov
Contributor
Loading…
rosa-gather-rhobs-logs: add OVN-K/CNCC/EgressIP log collection
#84304
opened Aug 31, 2026 by
redhat-chai-bot
Contributor
Loading…
rosa/cluster/wait-ready: add CLI retry logic and ERR trap for crash diagnostics
#84303
opened Aug 31, 2026 by
redhat-chai-bot
Contributor
Loading…
INTEROP-9434: OPP Q3 Batch 3 - CI stability fixes
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#84302
opened Aug 31, 2026 by
amp-rh
Contributor
Loading…
Fix pf-5, pf-4 CI jobs
rehearsals-ack
Signifies that rehearsal jobs have been acknowledged
#84301
opened Aug 31, 2026 by
Amoghrd
Contributor
Loading…
Perf testing
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
#84300
opened Aug 31, 2026 by
Amoghrd
Contributor
Loading…
Add multiple machine network job for UMN clusters
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
#84297
opened Aug 31, 2026 by
mhanss
Contributor
Loading…
Previous Next
ProTip!
Type g p on any issue or pull request to go back to the pull request listing page.